With the robot programming underway and working pretty well, we needed to being construction of the building so that we can begin running more in-depth tests with the robot.
We began by cutting two pieces of wood into 4 quadrants that will act as the floor of the building and then began cutting foam board and using hot glue to attack the foam board to the wood floors. The foam board will be the walls of the building.
We used a thinner foam board for the perimeter walls and a thicker foam board for inner walls. With just hot glue, we were quite surprised how solid the construction felt and will continue this process an have the full floor plan laid out by the end of this weekend.
We also are expecting to at the very least have the robot enter one room and perform its search function to locate, identify, and either download/subdue the target. Once this is complete its just a matter of extending the program so that the robot will continue to the other rooms in the building and perform the same function.
We are expecting a well rehearsed prototype to show off by our next class.
Friday, May 10, 2013
Week 5
Week 5 was a successful week working on the program of the robot. The line follow algorithm was already working well but we needed to integrate other functions into the program so that the robot could do more than just follow a line.
After a few iterations, we've got the robot able to follow a line into a room. Once in the room, the robot will begin to search for an object, find said object, and then identify the object. If the object is the intel (marked by something blue) the robot will then begin to "download" the information. If the object is hostile (marked by a red object) the robot will whack it with a hammer.
This set of functions is up and running pretty well as of now. We also discussed ways of having the robot find its way back to the line so that it can follow it onward into the other rooms. We're going to have the robot locate a wall in the room and begin following this wall until it finds the entrance to the room, where the line will be, and then get back on track with the line.
After a few iterations, we've got the robot able to follow a line into a room. Once in the room, the robot will begin to search for an object, find said object, and then identify the object. If the object is the intel (marked by something blue) the robot will then begin to "download" the information. If the object is hostile (marked by a red object) the robot will whack it with a hammer.
This set of functions is up and running pretty well as of now. We also discussed ways of having the robot find its way back to the line so that it can follow it onward into the other rooms. We're going to have the robot locate a wall in the room and begin following this wall until it finds the entrance to the room, where the line will be, and then get back on track with the line.
Saturday, April 27, 2013
Week 4
With the physical design completed, its time to turn to the programming of the robot. This is the more difficult task of the project. The robot will be performing several functions and the program needs to be written so that each function can execute without interfering with other functions.
So far the team is on schedule with the project and barring any setbacks should complete the project with all desired functions on time.
Week 3
Week 3 has come and gone and the final design for the SpyBot is complete. A few changes were made to the way we wanted to robot to perform its functions and this affected our overall design. We've decided that instead of physically extracting the sensitive information discovered while exploring the building, the SpyBot will now "download" the information. Upon locating a target, the robot will determine if the target is hostile or a piece of information relative to the mission. Hostile targets will be subdued with a hammer like weapon and sensitive information will be downloaded for retrieval at the extraction point.
In order to do this the physical design was simplified by only utilizing 1 NXT Brick to perform all functions.
In order to do this the physical design was simplified by only utilizing 1 NXT Brick to perform all functions.
Monday, April 15, 2013
Week 2
For the start of week 2 we submitted our design proposal which can be viewed by clicking on the design proposal button in the nav bar above this post.
Now it's time to get started on the fun stuff! Robot building time!! We received our two Lego NXT kits and began working on our physical design. Before diving too deep into building a robot we really had to think about what we wanted our robot to do and how we wanted it do that.
Ultrasonic Sensor: This sensor will send out an ultrasonic pulse that will bounce off of objects in front of the robot and return to the robot. This will allow the robot to know when there is an obstacle or wall in front of it. This will be useful for navigating around the building floor plan.
Color Sensor: Each main room in the building will have a different color; red, blue, green, yellow. The robot will utilize a color sensor to determine which room it is in and to know if it has already explored that room.
Light Sensor: This sensor will be used to help the robot find its way back out of the building. At the entrance to the building will be a stationary light. The robot will then use a combination of the light sensor and ultrasonic sensor to make its way back out of the building once the mission is complete.
Motor Usage: Two motors will be used for navigation to control each wheel independently. Independent wheel operation is key to having the robot be able to perform zero point turns in order to navigate the building more efficiently.
Color Sensor: A second color sensor will be used to determine if an object is to be either collected for extraction or destroyed on site.
Motor Usage. Two additional motors will be used here to control the collection and elimination mechanisms.
The preliminary robot design is still under construction. Expect some media (photos/video) once completed.
Now it's time to get started on the fun stuff! Robot building time!! We received our two Lego NXT kits and began working on our physical design. Before diving too deep into building a robot we really had to think about what we wanted our robot to do and how we wanted it do that.
Navigation:
We'll be using two Lego NXT bricks to build this robot. A single brick wouldn't offer enough sensor/motor inputs to accomplish everything we want this robot to do. One of these bricks will be utilized strictly for navigation purposes and will utilize the following sensors:Ultrasonic Sensor: This sensor will send out an ultrasonic pulse that will bounce off of objects in front of the robot and return to the robot. This will allow the robot to know when there is an obstacle or wall in front of it. This will be useful for navigating around the building floor plan.
Color Sensor: Each main room in the building will have a different color; red, blue, green, yellow. The robot will utilize a color sensor to determine which room it is in and to know if it has already explored that room.
Light Sensor: This sensor will be used to help the robot find its way back out of the building. At the entrance to the building will be a stationary light. The robot will then use a combination of the light sensor and ultrasonic sensor to make its way back out of the building once the mission is complete.
Motor Usage: Two motors will be used for navigation to control each wheel independently. Independent wheel operation is key to having the robot be able to perform zero point turns in order to navigate the building more efficiently.
Collection and Elimination:
The second Lego NXT Brick will be used to control the collection and elimination mechanisms on board the robot and will make use of some additional sensors and motors to help with these tasks.Color Sensor: A second color sensor will be used to determine if an object is to be either collected for extraction or destroyed on site.
Motor Usage. Two additional motors will be used here to control the collection and elimination mechanisms.
Now for the hands on!
Once we had a general idea of how the robot was to function while inside the building we had to start assembling the robot. We needed to make use of two Lego NXT bricks while being conscious of it's dimensions Too wide and the robot would have a difficult time navigating the halls and rooms of the building.The preliminary robot design is still under construction. Expect some media (photos/video) once completed.
Sunday, April 7, 2013
Week 1
Project Decision
First order of business in week 1 was to form our group and determine what project we were going to develop over the course of the next 10 weeks. We debated about different ideas we could incorporate into the development of the robot and a common theme of "shoot something" was tossed around. This lead to the decision to create a SpyBot.
We want to create a robot that is able to navigate a building and locate sensitive information. When it finds this information it will pick it up to bring back to the extraction point. During the robot's time navigating the building and locating this information, it is quite likely to rouse some suspension. When the robot encounters and identifies hostile targets, it will then eliminate these targets.
The overall function of our robot is to search a building for sensitive information and eliminate hostile targets along the way. In an order to do this, we had to split our team up and assign certain aspects of the overall project so that we could accomplish many things at once. Two people were tasked with designing and eventually creating the floor plan for the building that will be navigated through and the remaining three team members will be working on the development of the SpyBot.
The SpyBot is going to require an appropriate design that allows it to navigate the halls and rooms of the building quickly, being able enter doorways and avoid obstacles and running into walls. It will also need a method for detecting the sensitive information and then acquiring this information. The SpyBot will also need a way to identify hostile targets and have a means of eliminating them.
Project Assignments: Building Floor Plan Team
The building floor plan team is comprised of Joseph Grande and Jacob Sabu. Initial designs will be generated using AutoCAD and then later assembled with foam board. The floor plan design needs to large enough to have several rooms in which information and enemies can be randomly placed for the SpyBot to locate and needs proper hallway and room dimensions so that the SpyBot will fit. Without a initial design concept for the SpyBot, the initial floor plan will not include dimensions. Once the SpyBot concept is complete, proper dimensions can be assigned to the floor plan and then can be physically built.
Project Assignments: Designing the SpyBot
The SpyBot design has been assigned to Harsh Patel, Gina Medayil and John Rose. Using the design concepts decided upon during the Project Decision phase, the team will need to design a robot that has the correct physical attributes to get the job done. This includes being able to navigate hallways and rooms without running into walls or other obstacles and being able to identify its targets, the sensitive information and the hostiles.
Project Assignments: Design Proposal
One of the first things that needs to be completed for this project is our design proposal. The design proposal is an important document that outlines many aspects of what the team is building and how it is that we intend to accomplish our project. We need to provide a clear indication of what the team plans to deliver at the end of the 10 weeks, the technical activities that will be used in completing the project, as well as developing an appropriate timeline and budget. Team members were individually assigned sections from the proposal that best fits their part in the overall project.